Report to a moderator

I wish to report the following item:

A flat pack -grab & stick system was submitted for patent today by Sipeco-Structulates.

The system permits the eco-skin of the building to be errected first at high speed, during a short weather window , of 4-8 hours

Then the structural skeleton of steel or timber is attached to increase the rigidity of the building.

The dry-lining and the internal fittings are then competed at leisure

by Norman Davison