Skip to main content
A flat pack -grab & stick system was submitted for patent today by Sipeco-Structulates. The system permits the eco-skin of the building to be errected first at high speed, during a short weather window , of 4-8 hours Then the structural skeleton of steel or timber is attached to increase the rigidity of the building. The dry-lining and the internal fittings are then competed at leisure
by Norman Davison
Report to a moderator
I wish to report the following item:
A flat pack -grab & stick system was submitted for patent today by Sipeco-Structulates.
The system permits the eco-skin of the building to be errected first at high speed, during a short weather window , of 4-8 hours
Then the structural skeleton of steel or timber is attached to increase the rigidity of the building.
The dry-lining and the internal fittings are then competed at leisure
by Norman Davison